263 MIP

Project name

263 MIP

Location

Sipcot Perundurai

Type of structure

A type

Usage

Battery Lead Recycling Unit

70 MT

Tonnage

1,900 Sq.Mtrs

Area

26 mtrs 16.5 mtrs

Span / Height

DESCRIPTION

The project was executed for M/s Metstar Industries

CHALLENGES FACED

We completed this proposed project within a critical deadline as per the client’s request. So the structure installation was a significant challenge. This site had a shortage of space for crane movement bounded by pits and intermediate columns for machine floors.

RISK MANAGEMENT

Considering cost-effectiveness, we used the split space frame technology. At the time of its installation, there was a sudden breakage in the High Tensile Bolt at the bottom chord of the space frame. Our team immediately resolved the problem and saved the structure from further damages. We assembled a 36 meters length space frame on ground level with well-organized and proper planning. The vast assemblies were lifted and connected simultaneously at 30 meters with four giant capacity cranes. The building dimension is 134 m X 138 m X 16 m. / G + 8.