Case study

" we will either find a way, or make one "

In any Complicated Project risk is an inevitable event where things go the way not predicted or planned. In such situations, only ” RESPONSE TIME ” matters the most. The ability to handle risky situations by gathering all the resources with correct planning and execution by our team makes all the difference.

These Projects were extremely COMPLEX in Designing, Detailing, Fabrication, and Installation. Its been a way of life in Geometrics, pushing the limits of handling such wonderful Landmark Projects. We have listed a few of Such Projects. Failure does happen, but the way we handle makes us stand apart.

Shopping mall

380 FRM

Coffee processing factory

387 CCL

Asbestos Sheet Production Unit

448 SYI

Rice Mill

336 PAM

Show Room & Auto Spares Warhouse

377 TPKMSK

Marrriage Hall

333 GKS

Production unit of surgical implants and corporate office

381 JMD

For Auditorium

226 SVC

Battery Lead Recycling Unit

263 MIP

Textile dyeing unit

326 TCI

Open to sky covering / Gathering Area

414 RRT

Commercial Ware house

261 NND

Temple's Gathering hall for Food Offering

433 VCPA3

Shopping Mall with Multiplex Theatre

227 TKV

Auditorium

85 SNMV

Auditorium

91 SJC

Sports Stadium

110 KPG

Printing Unit

SFA

Industry

106 TMI

Industry

96 SSM

Auditorium

122 SHS

Multi Utility Outdoor Auditorium

SWS

Warehouse

255 HPR

Manufacturing

340 JAB

Showroom

304 TPK

Manufacturing plant for UPVC Windows

165 AMD